
Technology
Roatán Reef Resort
Gallery
The Roatán Reef Resort in view
Select any image to view it full size.
What the drawings show
What the drawings show

01
Glamphouses ring a Hexafarm
The basic unit of the plan is a hexagon. Glamphouses sit around the outside of the ring and face outward, and the water they enclose is a Hexafarm - the same polyculture cage running at the Reef Resort off Samal. Each module is accommodation wrapped around a working farm rather than around an empty pool.

02
A chain, not a building
The Glamphouse modules are linked end to end into a curving chain that follows the shoreline instead of squaring off against it, with ArkPad units moored separately off the chain. Drawn this way the development grows by adding another module to the end, which is a different proposition from a resort that has to be built to its final size on day one.

03
Solar over the roofs
Every Glamphouse canopy and every ArkPad roof in the drawings carries a panel array, and the walkways run under the same canopies. The arrays are shown as the primary roof surface rather than as equipment added on top of one.

04
You walk on from the shore
The chain connects to land by a walkway to a beach and pier, so the whole development is reached on foot. Boats appear throughout the drawings, but nothing in them requires a boat to get home.
What is actually known
It is our goal to build a second Reef Resort location near Próspera on the island of Roatán, Honduras.
ArkPad opened their Reef Resort in The Philippines in September 2025 and will build their second location near Próspera on the Island of Roatán.
Ownership
Buy ownership in a studio unit in Roatán.

Talk to us
Ask about the Roatán Reef Resort
Drawings, material specifications, pricing and lead times go out on request. Ask us a question about the Roatán Reef Resort and it reaches someone who can answer it.
Also from ArkPad





